Ch 02: Cost of Software Quality

207 Questions207 MCQs0 Short Questions0 Long Questions
๐ŸŽฏ Exam Practice Papers
SEMESTER PASS

CS611 - Software Quality Engineering Examination Practice

Timed practice exam simulation for CS611 - Software Quality Engineering.

๐Ÿ“˜ VU MID TERM EXAMLectures 1 to 22
โฑ๏ธ 60 Mins

Mid Term Examination

Covers syllabus of Lectures 1 to 22 with 30 high-yield MCQs in a timed exam environment.

๐Ÿ“30 MCQs
โฑ๏ธ60 Minutes
๐Ÿ“— VU FINAL TERM EXAMLectures 23 to 45
โฑ๏ธ 90 Mins

Final Term Examination

Comprehensive semester exam preparation with 45 MCQs covering Lectures 23 to 45 with complete course coverage.

๐Ÿ“45 MCQs
โฑ๏ธ90 Minutes
Showing 21 โ€“ 30 of 207 Questions
Page 3 of 21
Q21
โ“ MCQ๐Ÿ“˜ CS611๐Ÿ“‘ Lec 2๐Ÿท๏ธ 02.6. Cost of missing RequirementsEasy๐Ÿ”โญ๐Ÿ“„๐ŸŽ“VU๐Ÿ›๏ธVU
Prior to the public announcement of Yahoo's massive security breach, Verizon had negotiated to purchase Yahoo for $4.8 billion. What was the final revised sale price after the breach details were disclosed in early 2017?
  1. A.$4.8 billion (the price remained completely unchanged)
  2. B.$4.48 billion (the price was dropped by $350 million)
  3. C.$4.15 billion (the price was dropped by $650 million)
  4. D.$3.5 billion (the price was dropped by $1.3 billion)
Q22
โ“ MCQ๐Ÿ“˜ CS611๐Ÿ“‘ Lec 2๐Ÿท๏ธ 02.5. Example of missing requirementsMedium๐Ÿ”โญ๐Ÿ’ก๐Ÿ“„๐ŸŽ“VU๐Ÿ›๏ธVU
Consider a software product with an excellent, highly customized User Interface (UI) but no firewall for database security. Under the principles of Software Quality Engineering, which of the following is true?
  1. A.The software represents high quality because a good UI is mathematically more critical than database security.
  2. B.The product suffers from missing quality requirements, and adding a database firewall is more important than spending budget on cosmetic UI changes.
  3. C.The product represents a mature CMMI Maturity Level 5 system since the UI is verified.
  4. D.A secure database is irrelevant for the product's overall quality and safety profile.
Q23
โ“ MCQ๐Ÿ“˜ CS611๐Ÿ“‘ Lec 2๐Ÿท๏ธ 02.4. What are missing requirementsEasy๐Ÿ”โญ๐Ÿ’ก๐Ÿ“„๐ŸŽ“VU๐Ÿ›๏ธVU
Which of the following represents a true statement regarding the relationship between budget and software quality in real-time engineering projects?
  1. A.More budget means less quality because of excessive administrative overhead.
  2. B.More budget means more quality, resulting in a lower probability of product failure and saving financial resources.
  3. C.A larger budget has zero impact on software quality or product failure probability.
  4. D.Increasing the quality budget directly increases the likelihood of system security vulnerabilities.
Q24
โ“ MCQ๐Ÿ“˜ CS611๐Ÿ“‘ Lec 2๐Ÿท๏ธ 02.8. Direct Cost of missing Quality requirementsEasy๐Ÿ”โญ๐Ÿ’ก๐Ÿ“„๐ŸŽ“VU๐Ÿ›๏ธVU
According to the Cost Analysis Based Approach, which of the following best defines the 'Direct Cost' of missing software quality?
  1. A.Invisible, long-term costs that take a long time to manifest and are difficult to identify.
  2. B.Tangible, visible, and measurable effects that are directly linked to the missing quality and occur immediately after an unfortunate event.
  3. C.The salary paid to developers for writing code during the requirements phase of SDLC.
  4. D.The quantitative cost of configuring CMMI Level 5 optimization metrics.
Q25
โ“ MCQ๐Ÿ“˜ CS611๐Ÿ“‘ Lec 2๐Ÿท๏ธ 02.6. Cost of missing RequirementsEasy๐Ÿ”โญ๐Ÿ“„๐ŸŽ“VU๐Ÿ›๏ธVU
In late 2014, a massive security breach occurred at Yahoo due to missing quality (security) requirements. According to the course handouts, hackers managed to access personal information associated with at least how many user accounts?
  1. A.100 million accounts
  2. B.250 million accounts
  3. C.a half billion (500 million) accounts
  4. D.1 billion accounts
Q26
โ“ MCQ๐Ÿ“˜ CS611๐Ÿ“‘ Lec 2๐Ÿท๏ธ 02.2. Function-Quality-Cost(FQC)Mediumโญ๐Ÿ’ก๐Ÿ“„๐ŸŽ“VU๐Ÿ›๏ธVU
According to the Function-Quality-Cost (FQC) paradigm, what is the direct consequence of increasing the number of features in a closed-budget software development project?
  1. A.It certainly increases the budget share allocated for quality maintenance activities.
  2. B.It certainly decreases the budget share allocated for the quality of the product.
  3. C.It has no impact on quality because development and QA are independent of budget constraints.
  4. D.It automatically doubles the total available project budget through sales revenue.
Q27
โ“ MCQ๐Ÿ“˜ CS611๐Ÿ“‘ Lec 2๐Ÿท๏ธ 02.9. Indirect Cost of Missing Quality RequirementsEasy๐Ÿ”โญ๐Ÿ’ก๐Ÿ“„๐ŸŽ“VU๐Ÿ›๏ธVU
Which of the following serves as a primary characteristic of the 'Indirect Cost' of missing software quality?
  1. A.They are tangible and easily measurable immediately after a system failure.
  2. B.They are invisible, difficult to calculate, and can remain hidden for a long period before manifesting.
  3. C.They represent the immediate physical injury occurring during an operational crash.
  4. D.They are paid directly to the customer as part of contractual service level agreements.
Q28
โ“ MCQ๐Ÿ“˜ CS611๐Ÿ“‘ Lec 2๐Ÿท๏ธ 02.1. Economics of Software Quality EngineeringEasyโญ๐Ÿ’ก๐Ÿ“„๐ŸŽ“VU๐Ÿ›๏ธVU
According to Module 02 of the course handouts, which of the following is a primary reason why software quality is exceptionally difficult to define?
  1. A.Because software quality remains completely static across all operating environments and user configurations.
  2. B.Because the definition of quality is dictated solely by third-party CMMI lead auditors.
  3. C.Because different stakeholders (such as developers, users, clients, managers, and quality engineers) have different perceptions of quality, and it depends on the circumstances and environment of use.
  4. D.Because software is a physical product whose material dimensions must conform to rigid construction tolerances.
Q29
โ“ MCQ๐Ÿ“˜ CS611๐Ÿ“‘ Lec 2๐Ÿท๏ธ 02.6. Cost of missing RequirementsEasy๐Ÿ”๐Ÿ“„๐ŸŽ“VU๐Ÿ›๏ธVU
What types of confidential user information were leaked and hit the market as a consequence of the Yahoo security breach, putting millions of users at stake?
  1. A.Only public user nicknames and profile avatars
  2. B.Confidential user information including email, credit card details, and bank account details
  3. C.Internal company source code and compiler log files only
  4. D.Server IP addresses and developer configuration credentials
Q30
โ“ MCQ๐Ÿ“˜ CS611๐Ÿ“‘ Lec 2๐Ÿท๏ธ 02.13. Level of RisksEasy๐Ÿ”โญ๐Ÿ’ก๐Ÿ“„๐ŸŽ“VU๐Ÿ›๏ธVU
According to the IEEE Standard for Software Verification and Validation scale of criticality in Module 02, which level is characterized by continuous 24-hour usage, irreversible environmental damages, loss of human lives, and disastrous economic or social impact?
  1. A.Level A: Catastrophic
  2. B.Level B: Critical
  3. C.Level C: Marginal
  4. D.Level D: Negligible