In the Constructive Cost Model (COCOMO) framework, which of the following represents a key difference between Basic COCOMO and Intermediate COCOMO?
Ch 08: Project Scheduling and Network Diagrams
Covers task dependency sequencing (FS, SS, FF, SF), forward and backward pass calculations for early/late start/finish times, total float, free float, critical path identification, and three-point PERT probability estimation.
74 Questions74 MCQs0 Short Questions0 Long Questions
SEMESTER PASS
CS615 - Software Project Management Examination Practice
Timed practice exam simulation for CS615 - Software Project Management.
Showing 1 – 10 of 74 Questions
Page 1 of 8
List the three essential steps involved in estimating software project development effort when using the Basic COCOMO technique.
Under which of the following scenarios is it most appropriate to use the Basic COCOMO technique rather than Intermediate or Advanced COCOMO?
Differentiate between the Basic COCOMO and Intermediate COCOMO effort estimation techniques. In your response, compare their estimation steps, complexity, and criteria for determining applicability to a software project.
When estimating effort using the Intermediate COCOMO technique, which parameter is calculated by assigning ratings to 15 different cost driver attributes across project, product, personnel, and computer categories?
List the four main categories of cost driver attributes used to calculate the Effort Adjustment Factor (EAF) in the Intermediate COCOMO technique.
Explain the key advantages of using the Function Point (FP) technique for software project estimation instead of the Source Lines of Code (SLOC) technique. Discuss how FP addresses language dependency, handles mid-project requirements changes, and fits within iterative life cycle models like Prototyping and Spiral.
Define the term 'estimation' in software project planning, and list the three basic estimates that must be performed in sequence.
In software project planning, which of the following factors serves as the primary prerequisite to estimate the final cost, effort, and duration of the project?
Define the Constructive Cost Model (COCOMO). Elaborate on its three levels of implementation and compare the characteristics of the three project types used to categorize software efforts.