Ch 08: Project Scheduling and Network Diagrams

74 Questions74 MCQs0 Short Questions0 Long Questions
🎯 Exam Practice Papers
SEMESTER PASS

CS615 - Software Project Management Examination Practice

Timed practice exam simulation for CS615 - Software Project Management.

📘 VU MID TERM EXAMLectures 1 to 22
⏱️ 60 Mins

Mid Term Examination

Covers syllabus of Lectures 1 to 22 with 30 high-yield MCQs in a timed exam environment.

📝30 MCQs
⏱️60 Minutes
📗 VU FINAL TERM EXAMLectures 23 to 45
⏱️ 90 Mins

Final Term Examination

Comprehensive semester exam preparation with 45 MCQs covering Lectures 23 to 45 with complete course coverage.

📝45 MCQs
⏱️90 Minutes
Showing 11 – 20 of 74 Questions
Page 2 of 8
Q11
❓ MCQ📘 CS615📑 Lec 8🏷️ 08.3. Cost Estimation Models (COCOMO)Easy⭐💡📄🎓VU🏛️VU
Which of the following experts propounded the COCOMO (Constructive Cost Model) technique in 1981, and what are its three levels of implementation?
  1. A.Dr. Barry Boehm; Basic, Intermediate, and Advanced
  2. B.Watts Humphrey; Initial, Managed, and Optimizing
  3. C.Alan Davis; Prototype, Evolutionary, and Spiral
  4. D.Edward Yourdon; Structured, Object-Oriented, and Dynamic
Q12
📝 Short Q📘 CS615📑 Lec 8🏷️ 08.2. Decomposition Techniques & Software SizingMedium⭐💡📄🎓VU🏛️VU
What is the Source Lines of Code (SLOC) technique, and why is it considered an objective method for estimating software size?
Q13
🧠 Long Problem📘 CS615📑 Lec 8🏷️ 08.3. Cost Estimation Models (COCOMO)Hard⭐💡🌟📄🎓VU🏛️VU
Explain how a software project manager transitions from software sizing to project scheduling. In your response, contrast the role of Source Lines of Code (SLOC) and Dr. Barry Boehm's COCOMO technique in determining project effort, and describe how project scheduling allocates this effort.
Q14
❓ MCQ📘 CS615📑 Lec 8🏷️ 08.3. Cost Estimation Models (COCOMO)Easy⭐💡📄🎓VU🏛️VU
In the Basic COCOMO technique, which of the following formulas is used in the final step to calculate the initial nominal software development effort?
  1. A.Ei = a1 * (KLOC)^a2
  2. B.Ei = EAF * a1 * (KLOC)
  3. C.Ei = (KLOC) * a1^a2
  4. D.Ei = a1 * (EAF)^a2
Q15
📝 Short Q📘 CS615📑 Lec 8🏷️ 08.3. Cost Estimation Models (COCOMO)Medium⭐💡🌟📄🎓VU🏛️VU
Identify the three steps involved in estimating the software development effort using the Basic COCOMO technique.
Q16
❓ MCQ📘 CS615📑 Lec 8🏷️ 08.2. Decomposition Techniques & Software SizingEasy🔁⭐💡📄🎓VU🏛️VU
Which of the following is NOT a direct or indirect software size metric used in software project estimation?
  1. A.Source Lines of Code (SLOC)
  2. B.Function Points (FP)
  3. C.Person-Months of Effort
  4. D.Object Points
Q17
❓ MCQ📘 CS615📑 Lec 8🏷️ 08.3. Cost Estimation Models (COCOMO)Easy⭐💡📄🎓VU🏛️VU
Which of the software cost estimation models assumes that both development effort and schedule are functions of product size alone?
  1. A.Basic COCOMO model
  2. B.Intermediate COCOMO model
  3. C.Detailed COCOMO model
  4. D.All three COCOMO models
Q18
📝 Short Q📘 CS615📑 Lec 8🏷️ 08.1. Estimation Concepts & Critical FactorsMedium⭐💡📄🎓VU🏛️VU
Define the concept of the 'degree of structural uncertainty' and explain how it affects estimation risk in software project management.
Q19
📝 Short Q📘 CS615📑 Lec 8🏷️ 08.3. Cost Estimation Models (COCOMO)Medium⭐💡🌟📄🎓VU🏛️VU
Write down the mathematical formula used to estimate software development effort using the Intermediate COCOMO technique, and define each of its components.
Q20
❓ MCQ📘 CS615📑 Lec 8🏷️ 08.3. Cost Estimation Models (COCOMO)Easy🔁⭐📄🎓VU🏛️VU
Which of the following software project types under the COCOMO model is characterized by stringent and highly specialized hardware, software, and operational constraints, and is typically associated with space aviation or real-time operating systems?
  1. A.Organic
  2. B.Semidetached
  3. C.Embedded
  4. D.Incremental